Construction Video Report for October 2023:
- Roof readiness – 70% (insulation: screed and membrane).
- Opening cut for the parking lot lift + preparation for top insulation (isolation).
- 40% of balcony railings installed.
- Preparation for screeding in common areas (lobby, corridors).
- Entrance doors ordered (installation after screeding).
- Façade completion – 90%.
