Video report on construction for February 2024:
- Continuing to pour walls and diaphragms of the lower level parking
- Reinforced and prepared for pouring the entrance + walls of the lower level parking fence
- Completed pouring the parking floor 100%
- Poured the foundation of the elevator shaft, and also reinforced and poured the elevator of the lower level parking