Video report on construction for February 2024:
- Poured the floors between the first and second floors for 6 cottages
- Building the second floor of the first 4 cottages
- Poured columns for the first floor in the first residence
- Working on fencing, landscaping, and site planning
- Delivered 100 trucks of black soil = 2000 cubic meters